Job No. 003

Houston 77066

Tear-off and new shingles on the same Friday. The flashing was set at night, by flashlight, until it was done right.

October 21. The finished roof from above the front yard.
October 21. The finished roof from above the front yard.
inspected
October 14, 2025
tear-off + shingles
October 17, 2025 — same day
drone finals
October 21, 2025
flashing
replaced; logged November 4, 2025
shingles
Atlas Pinnacle Pristine

What we found

The inspection went up on the roof instead of guessing from the ground — every plane walked and photographed.

October 14. The house before the build, old roof still on.
October 14. The house before the build, old roof still on.
October 14. From the top of the old roof, looking down the front slope.
October 14. From the top of the old roof, looking down the front slope.
October 14. The back field — granule loss across the courses, an aging box vent.
October 14. The back field — granule loss across the courses, an aging box vent.

Build day

Materials landed in the driveway at first light on a Friday, and the old roof came down behind them.

October 17. Shingles, hip-and-ridge, underlayment, and coil nails staged in the driveway.
October 17. Shingles, hip-and-ridge, underlayment, and coil nails staged in the driveway.
October 17. The front slopes going down to bare decking — tarps below catching the debris.
October 17. The front slopes going down to bare decking — tarps below catching the debris.
October 17. The back of the house at bare deck — every old shingle off before anything new went on.
October 17. The back of the house at bare deck — every old shingle off before anything new went on.

The layers

What goes under the shingles is what keeps the water out. The valleys were re-lined and the deck covered in new synthetic underlayment before shingling started — all of it the same day.

October 17. A valley re-lined — membrane and underlayment layered down the run.
October 17. A valley re-lined — membrane and underlayment layered down the run.
October 17. New shingles on, straight courses — the same day the old roof came off.
October 17. New shingles on, straight courses — the same day the old roof came off.

The finish

The drone went up the following Tuesday for the finals.

Logged October 21. The finished roof, from above.
October 21. The garage gable — the new field around the brick vent medallion.
October 21. The garage gable — the new field around the brick vent medallion.

Until it was done right

The flashing didn't get skipped when the light ran out. The old metal came out of the wall; the new metal was set and checked by flashlight, and the video went into the job record.

Logged November 4. A section of the old flashing, kept and photographed for the record.
Logged November 4. A section of the old flashing, kept and photographed for the record.
Logged November 4. New flashing metal along the roof line, checked by flashlight after dark.
Logged November 4. New flashing metal along the roof line, checked by flashlight after dark.