Job No. 007

Houston 77066

A roof system built layer by layer — documented from tear-off to drip edge, with a return visit to check the details.

November 4. The finished roof in golden-hour light.
November 4. The finished roof in golden-hour light.
torn off + dried in
October 29, 2025
final drone photos
November 4, 2025
punch-list visit
November 10, 2025
shingles
Atlas Pinnacle Pristine
underlayment
RoofNado AnchorDeck synthetic

The old roof

The drone went up before the first shingle came off. Materials in the driveway, crew staged, the old roof photographed from overhead.

October 29. The crew stages in the driveway; the old roof gets its last aerial.
October 29. The crew stages in the driveway; the old roof gets its last aerial.
October 29. The roof before tear-off, from directly overhead.
October 29. The roof before tear-off, from directly overhead.

Protection first

The materials arrived labeled, and the landscaping went under tarps before tear-off began.

October 29. Atlas Pinnacle Pristine bundles and RoofNado AnchorDeck underlayment rolls on the driveway pallet.
October 29. Atlas Pinnacle Pristine bundles and RoofNado AnchorDeck underlayment rolls on the driveway pallet.
October 29. The back patio and beds under tarps, catching debris before it lands.
October 29. The back patio and beds under tarps, catching debris before it lands.

Tear-off

Old shingles came off in sections, straight down to the decking, with the drone recording the whole sequence.

October 29. The drone over the tear-off, half the deck bare.
October 29. Mid tear-off from overhead — old shingles coming off in sections.
October 29. Mid tear-off from overhead — old shingles coming off in sections.
October 29. The main slopes stripped to decking, debris staged on tarps below.
October 29. The main slopes stripped to decking, debris staged on tarps below.

The dry-in

Blue synthetic underlayment sealed the deck the same day, and shingle bundles were loaded along the slopes while it went down.

October 29. Underlayment over the upper slopes while shingles start on the lower roof.
October 29. Underlayment over the upper slopes while shingles start on the lower roof.
October 29. The rear slope dried in, bundles staged in rows for the install.
October 29. The rear slope dried in, bundles staged in rows for the install.

The finish

The finished roof was photographed by drone the following week.

November 4. The rear planes and new ridge lines from above.
November 4. The rear planes and new ridge lines from above.

We came back

Six days after the drone finals, we walked the edges — fascia, drip edge, gutters — and photographed the details most people never look at. That visit is part of the file.

November 10. Drip edge and fascia line, checked up close.
November 10. Drip edge and fascia line, checked up close.
November 10. Gutter interior — hanger, outlet, and sealant, checked up close.
November 10. Gutter interior — hanger, outlet, and sealant, checked up close.