Job No. 010
Houston 77066
Inspected in October. Rebuilt under a gray January sky. Flown two days later in full winter sun.

- inspected
- October 21, 2025
- build day
- January 13, 2026
- drone finals
- January 15, 2026
- underlayment
- CraftGrade W20 synthetic, full deck
- protection
- beds and walkways tarped before tear-off
- documentation
- ground and air, October through January
- status
- complete
The October inspection
Before anything else happened, the roof was walked and photographed — the whole field, not a convenient corner of it. The worn shingles made their own case.



Build morning, under cloud
January came in gray. Before the first square of old roof moved, everything below it was covered or carried clear.


Down to the wood
The drone kept station overhead while the old roof came off. One frame holds the whole method: old shingle, bare deck, and new underlayment meeting on the same slope.


The system, layer by layer
Synthetic underlayment sealed the deck, then the new field went up slope by slope. The spec sat on the driveway where the camera could read it.


Two days later, from the air
The clouds that sat over the build were gone by the time the drone came back for finals.


Don't take our word for it.
CraftGrade W20 synthetic underlayment
The printed product name is legible across the sealed deck in the mid-build photos and video.
Documented start to finish
Rooftop inspection frames October 21, build-day coverage January 13, drone finals January 15.
Landscaping protected
Tarps over the beds and a cleared driveway, photographed before tear-off began.